Hey, do you guys have a lead time on AAC
5.56 SD
M42k
7.62sd
Sdn6?
Thanks.
Posted: 2/10/2016 4:58:49 PM EDT
[#1]
All of them are expected within the next 4 weeks except the M42000 which is 3-4 weeks after the others. The rest could be in next week or 4 weeks later.