I run 75 daily from exit 74 to exit 43 5 day a week.. nothing to worry about.. heading south on 75 on a Saturday is smooth sailing,, so Downtown Dayton has construction,, south bound has you on 3 smooth lanes lane shift,, as actual contruction is on opposite side of interstate, outside of concrete barriers from the north bound 2 lane rough road traffic.. Heading south, been told in spring that Dayton PD was enforcing the 45 speed.. I aint seen anything,, stay left to go on through, spread out, and keep moving
I periodically run 75 north from exit 74 to exit 127 (north side of Lima).. crappy construction/ lane shift from 124 post ?? down to around 118 exit.. here again, pay attention, and keep moving
Some lane shift heading north around 90 stick to around 95 stick through Sidney, lane shift-2lane heading south
Lane shift north around stick 77 north to around stick 79,, same south bound, exit 78 closed with lane shift for bridge replacemnt/repair