Warning

 

Close

Confirm Action

Are you sure you wish to do this?

Confirm Cancel
BCM
User Panel

Site Notices
Posted: 1/24/2006 5:59:18 PM EDT
January 30, 2006

New mission, new machine
Next helo designed to head into hot zones

By Gayle S. Putrich
Times staff writer

The Corps’ heavy-lift mission has changed.
And the helicopter is changing along with it.

A replacement for the CH-53E Super Stallion is on the drawing board at the Pentagon, and it’s a major improvement over the older bird.

It’s called the CH-53K, a heavy-lift aircraft designed for heading into hot zones.

“This helicopter was never envisioned to operate tactically,” said John Milliman, a spokesman at Naval Air Systems Command in Patuxent River, Md., referring to the CH-53 family of heavy-lift helicopters.

But for the last several years, the 53E has been operating as part of the assault wave, rather than just the supply line.

“The K, from the get-go, is going to be designed to go in harm’s way,” Milliman said. “For Marines on the ground, that means that it will be better able to support them no matter where they are.”

Designing an aircraft with specific uses and conditions in mind will also make the new helicopter more maintainer-friendly, he said.

The 53E is the Navy Department’s most expensive aircraft per flight hour, largely because of the amount of maintenance it requires: about 44 hours for every flight hour. The 53K is expected to slash maintenance time and costs by 45 percent.

“The mission has changed, and the 53K is going to, right off the assembly line, truly meet the mission requirements,” Milliman said.

An initial $8.8 million contract with Sikorsky was signed Jan 3. The first flight of the Super Stallion replacement is expected on Nov. 11, 2011, with deliveries going to the fleet in 2015. All 156 helicopters are expected to be in the air by 2021.

The new 53K will have ballistic armor built into the floor of the cargo bay, as well as underneath the cockpit. The three phases of armor vulnerability tests on the setup are underway at China Lake Naval Air Warfare Center, Calif., said Col. Paul Croisetiere, Marine Corps heavy-lift program manager at NavAir.

While there will be fewer seats on the 53K — down to 30 flip-up, crashworthy seats from the 55 on the 53E, which had none rated for crashes — the elimination of the center row of seats from the design will help focus the helicopter’s mission.

“Passengers are the primary mission of the V-22 [Osprey],” Croisetiere said, “with its speed advantage,” whereas the 53K “has a significant payload advantage and a primary mission of equipment transportation. They will be complementary aircraft.”

The new helo will be able to handle more than twice the external cargo than the Echo — 27,000 pounds to the E’s 12,100 — with a maximum weight of 84,700 pounds, a 16 percent increase. The 53K will also be able to internally load two Humvees, one light armored vehicle or up to 30 leathernecks.

New rotor blades will provide more lift and last longer in harsh desert conditions. Those blades, combined with advanced engines with a horsepower boost and the latest in gearboxes, are expected to provide a 558 percent increase in combat radius from the 53E.

“Engine technology has moved a long way” since the design of the current flight of 53s, Croisetiere said.

The new helicopter’s footprint will be only slightly smaller — narrowed by 6 feet — so the same number will fit on the decks of amphibious ships, Sikorsky representatives said. But they will be easier to handle and move aboard ship.

Even with all the technological improvements, the 53K will not be a totally new helicopter. In fact, it isn’t expected to look or feel that different from the 53E — just be a lot more powerful.

Logistics systems in the 53K will be based on the systems developed for the Joint Strike Fighter, allowing for easier interoperability among aircraft and training — and keeping costs down.

And while the windscreens will be widened, the Marine Corps and Sikorsky are looking to tweak existing cockpits to be used in the 53K.

“We’re not going to reinvent the cockpit,” Croisetiere said.

The 53Ks are projected to cost about $56.6 million each on average, making it one of the most expensive aircraft the Marine Corps has ever fielded, according to Croisetiere.

The program is expected to cost about $18.8 billion, from design to flight, which is predicted to take nine years.

Problems on the horizon

The biggest concern for the Corps’ heavy-lift program isn’t what kind of engine will go into the new helicopters or what they will look like: It’s whether the helicopters it already has will last until the 53K is ready.

Attrition has already far exceeded inventory requirements set by the Corps, with 150 53Es currently flying of the 160 it says are needed.

Another 35 CH-53D Sea Stallions are rounding out the unit.

“The fleet is living with it. But we have an inventory issue with heavy lift,” Croisetiere said.

The Corps can bump that number up to 152, Croisetiere said, by pulling two mothballed 53Es out of the desert Aircraft Maintenance and Regeneration Center and doing an 18-month, 150-point refit that he says is worth whatever it will cost.

“It’s money well spent for us,” he said.

Milliman estimated the refitting cost at $17 million, or $8.5 million per aircraft.

Three helos have already been refitted, he said, but at the slightly lower cost of $8 million each, because they were in better condition.

But even with the current refit, fatigue life issues on the 53Es, which came into the fleet in 1981, are expected to start taking a serious toll in 2011, and all the helicopters will need major airframe surgery to keep going until the 53K is ready in 2015.

Croisetiere said he expects to lose 11 to 12 aircraft a year starting in 2011, and the Corps is still working on a fix for the worn-out transition bulkhead, where the tail boom folds in to compact the helicopters on deck.

A plan is expected to be put in place in the next six to eight months, Croisetiere said.

According to Milliman, moving up the already-tight production schedule of the 53K is just not possible.

“We’re at a point now where the schedule is such that we’re probably going to bring the 53K online as soon as we can,” Milliman said. “But we don’t program a lot of fat into the schedule.”


Link Posted: 1/24/2006 6:03:20 PM EDT
[#1]

The new helo will be able to handle more than twice the external cargo than the Echo — 27,000 pounds to the E’s 12,100 — with a maximum weight of 84,700 pounds, a 16 percent increase. The 53K will also be able to internally load two Humvees, one light armored vehicle or up to 30 leathernecks.
Holy crap! Carry an LAV internally?

Kharn
Link Posted: 1/24/2006 6:03:34 PM EDT
[#2]
The new helo will be able to handle more than twice the external cargo than the Echo — 27,000 pounds to the E’s 12,100 — with a maximum weight of 84,700 pounds, a 16 percent increase. The 53K will also be able to internally load two Humvees, one light armored vehicle or up to 30 leathernecks.



Internal LAV or two hummers.....doubtful unless its a major re-design

They can already lift LAV's slung...mith more margin on weight, could allow more armor on the Marine LAV's
Link Posted: 1/24/2006 6:05:00 PM EDT
[#3]
They probably skipped right to "K" because 53K is the dollar per hour operating cost...

Seriously, what is the engine upgrade to ?  Three T700 variants?
Link Posted: 1/24/2006 6:11:27 PM EDT
[#4]
They're working towards this...


Link Posted: 1/24/2006 6:12:48 PM EDT
[#5]
edit
Link Posted: 1/24/2006 6:37:58 PM EDT
[#6]
Bump
Link Posted: 1/24/2006 6:40:01 PM EDT
[#7]
I bet you it's a variant of the SuperBug!
Link Posted: 1/24/2006 6:45:36 PM EDT
[#8]

Quoted:
I bet you it's a variant of the SuperBug!


Bah! The SuperBug is far too much capability.
Link Posted: 1/26/2006 1:12:08 PM EDT
[#9]
I can't believe no one mentioned the photochop on the H-53....
Link Posted: 1/26/2006 5:18:36 PM EDT
[#10]

Quoted:
I can't believe no one mentioned the photochop on the H-53....

With something that big, you need the three crewman looking at the deck. The US Navy doesnt pay for the radar sensor like on the back of your Escalade so you dont run into anything.

Kharn
Link Posted: 1/26/2006 5:20:21 PM EDT
[#11]

Quoted:

Quoted:
I can't believe no one mentioned the photochop on the H-53....

With something that big, you need the three crewman looking at the deck. The US Navy doesnt pay for the radar sensor like on the back of your Escalade so you dont run into anything.

Kharn



The engines, the engines.......
Is no one an aircraft mechanic?
Link Posted: 1/27/2006 8:56:47 AM EDT
[#12]
It should be called the Ultra Stallion now.
Link Posted: 1/27/2006 9:03:47 AM EDT
[#13]
KA3B,
The pick looks just like the pic The Army's been posting for several years.
Judging by the fact that they didn't obsessively stamp MARINES on the side, it must be Boeing's pitch for both services.
Link Posted: 1/27/2006 12:29:56 PM EDT
[#14]


It has three engines on one side and three guys looking out the crew doors.
It's funny.

Link Posted: 1/27/2006 1:05:10 PM EDT
[#15]
That IS funny.... your pic is just too darned small to see the crewman peeking out though

All the engines were making me go whaaaaa?

Dram
Link Posted: 1/27/2006 1:22:08 PM EDT
[#16]

Quoted:
January 30, 2006
...
www.vaq34.com/usmcch53k.jpg



Nice Photoshop.

Two front nosegear, 3 guys, 6 engines...oh yeah! Homer-mobile!
Link Posted: 1/27/2006 1:42:24 PM EDT
[#17]

Quoted:

Quoted:

Quoted:
I can't believe no one mentioned the photochop on the H-53....

With something that big, you need the three crewman looking at the deck. The US Navy doesnt pay for the radar sensor like on the back of your Escalade so you dont run into anything.

Kharn



The engines, the engines.......
Is no one an aircraft mechanic?


I spotted it right away, but this is the first I've seen it.
So you've already spoiled it.
Link Posted: 1/27/2006 1:45:46 PM EDT
[#18]

Quoted:
I can't believe no one mentioned the photochop on the H-53....



I was going to comment on that...
Link Posted: 1/27/2006 1:47:35 PM EDT
[#19]

Quoted:
I can't believe no one mentioned the photochop on the H-53....



I just giggled. Why comment?
Close Join Our Mail List to Stay Up To Date! Win a FREE Membership!

Sign up for the ARFCOM weekly newsletter and be entered to win a free ARFCOM membership. One new winner* is announced every week!

You will receive an email every Friday morning featuring the latest chatter from the hottest topics, breaking news surrounding legislation, as well as exclusive deals only available to ARFCOM email subscribers.


By signing up you agree to our User Agreement. *Must have a registered ARFCOM account to win.
Top Top