Posted: 9/10/2012 6:53:58 AM EDT
|
....Holy Sh*t
They should name it the D "Effed-Up" Connector, or the D "FFFFUUUUUU" Connector. This morning was a display of a soup sandwich of epic proportions––I can't believe how messed up it is!!!! I'll be very pleased once it's completed; truly it has to improve, right?!?! |
|
Quoted:
Quoted:
121 and 114 connection highway construction. Traffic opened on the big overpass today. And I am so ready for it to be done. 635 construction will be much worse though in the coming years. 635 is going to be hell soon. Yeah I'm transfering job locations from Dallas to Frisco just so I don't have to deal with 635 anymore. |
| It'd help if they would've added some better signage with the traffic switch over the weekend. Coming north on 121 the right lane runs out right where 121 north merges with 114 east. No sign and no warning. Can't even see it in the curve until it's too late. Saturday there was a car crushed between the barrier and an 18 wheeler. Car never even had a chance to know the lane ended until it was too late. I came through there again today and the same spot was backed up with people trying to negotiate the merge. |
|
Quoted:
It'd help if they would've added some better signage with the traffic switch over the weekend. Coming north on 121 the right lane runs out right where 121 north merges with 114 east. No sign and no warning. Can't even see it in the curve until it's too late. Saturday there was a car crushed between the barrier and an 18 wheeler. Car never even had a chance to know the lane ended until it was too late. I came through there again today and the same spot was backed up with people trying to negotiate the merge. Better signage won't help. Most of the idiots are either on the phone or looking at the text message they just got and not looking at the road signs. Mondays are always they worst after the weekend it seems. |
|
Quoted:
....Holy Sh*t They should name it the D "Effed-Up" Connector, or the D "FFFFUUUUUU" Connector. This morning was a display of a soup sandwich of epic proportions––I can't believe how messed up it is!!!! I'll be very pleased once it's completed; truly it has to improve, right?!?! Doubtful. 75 thru McKinney has been a perpetual cluster. That's where all the jobs are going; road construction. There's zero incentive to complete building any public sector works project. |
|
Quoted:
Quoted:
It'd help if they would've added some better signage with the traffic switch over the weekend. Coming north on 121 the right lane runs out right where 121 north merges with 114 east. No sign and no warning. Can't even see it in the curve until it's too late. Saturday there was a car crushed between the barrier and an 18 wheeler. Car never even had a chance to know the lane ended until it was too late. I came through there again today and the same spot was backed up with people trying to negotiate the merge. Better signage won't help. Most of the idiots are either on the phone or looking at the text message they just got and not looking at the road signs. Mondays are always they worst after the weekend it seems. Horseshit. The civil engineers doing this are tier 1 retards. |