Posted: 8/28/2008 7:19:39 AM EDT
| My wife applied for her renewal 2 days afte me and was contacted less than 2 weeks later to inform her that it was ready for p/u. I have yet to get my call at the 29day point. They probably moved me to the bottom of the stack when I called to inquire about its status! We are in Summit County BTW. What have your turn around times been lately? |
That makes me feel a little better. My wife picked hers up today and the deputy told her that they issue them when BCI gets the print results back to them. My 45 day limit is up on 9/13 which is a Satuday. If that day approaches and I have not received my phone call, does that mean I can go down and have the issue my permit? |
| Finally received my call after 35 days. How difficult is it to run my prints and perform a background check? They said that the wait time is basedupon when the BCI gets back to them with the print verification. I updated the link above but the number of reviews and avg time did not change. Thanks to all who replied. |