Armory Sponsor
Posted: 9/27/2013 3:31:47 PM EDT
|
Mailed 15 Jan
Check cashed 30 Jan Correction letter received and mailed back 5 July Approved 22 September Getting ready to send my lower to be engraved. Building a 10.2" .300. still waiting on suppressor paperwork to be approved. Mailed it later. check cashed 2 April.. |
|
Quoted:
You sent the form BEFORE engraving? Tssk tssk It's not an SBR until it gets the short upper put on it, err go it's a title 1 firearm until then. Nothing wrong with engraving after approval, as long as you are patient enough to wait to assemble it into an SBR |
|
Quoted:
It's not an SBR until it gets the short upper put on it, err go it's a title 1 firearm until then. Nothing wrong with engraving after approval, as long as you are patient enough to wait to assemble it into an SBR Quoted:
Quoted:
You sent the form BEFORE engraving? Tssk tssk It's not an SBR until it gets the short upper put on it, err go it's a title 1 firearm until then. Nothing wrong with engraving after approval, as long as you are patient enough to wait to assemble it into an SBR Yeah, I've got time. The lower has never even been assembled. Bought it stripped and it has stayed that way. Now to send it off, wait for it's return so I can have some cerakote work done.. |
I'm on pretty much the same timeline as you are. I got my Form 1 back on 9/19, mailed it out on 1/19. I also have a Form 4 pending that was mailed 3/25 for my suppressor. In my case though I've got to wait for the Form 4 before I can do anything as the suppressor is integral to the upper. Seriously thinking about building a "normal" SBR upper so I can put this tax stamp to use NOW!
|
Armory Sponsor