AR Sponsor
Posted: 4/21/2006 8:06:19 PM EDT
|
This is my first build so i know this is very newb and i think i already know the answer just want confirmation, when installing the gas tube just insert it into the upper Rec and then into the gas block? is that it for gas tube installation. i was also wondering how will i know if i put the gas tube in the recevior too far? sorry for the newb ? Thanks -Troy |
| You have to pin the gas tube in place with a small roll pin through the FSB. Look at your gas tube. You'll see 3 holes at the front end, the larger gas port tube that faces downward and two smaller holes. Those are for the roll pin. Orient the tube, slide it in until you see the hole through the tube line up with the holes in the FSB. Knock in your roll pin. Done. |
AR Sponsor