AK Sponsor
Posted: 7/19/2005 3:34:21 PM EDT
| After the kit is disassembled, in what order do you put things back together again? |
|
Here's the order I use. I'd be open to any suggestions to changing my order, I'm not dead set on my ways... A screw build/weld build would be the same order. Bend receiver and top rails Heat treat and Kasenit axis pin holes and ejector Rivet trigger guard Trim top rails for TRUNIONS ONLY Rivet front trunion with proper mag/mag catch clearance Temp install rear trunion and center support Trim top rails for CARRIER Press in barrel Check headspace Install barrel pin Rivet rear trunion Weld lower rails - if MIG welding, drill holes WITHOUT rails in place, smooth interior flush Rivet center support Paint/Park/Blue ETA: Next time I'm drilling my lower rail holes before I use Kasenit (one of the first steps). That stuff really works, it was a BITCH to drill near the Kasenit'ed areas while the non-treated areas were like butter. |
|
i do them in this order but im to lazy to use 80% recs they are just to damn much work even if you where only making min wage its cheaper to goto work and buy 1 already done #1 open hole for double hook #2 install trigger guard #3 use a clip to get location for front trunnion #4 mark drill and rivet front trunnion #5 install barrel/pin #6 use top cover to find location of rear trunnion and mark #7 drill and install rear trunnion #8 test fit carrier and mod where needed hope this helps PS i know its not a clip and theres no such thang as a rear trunnion i just enjoy pissing off you overly anal peeps |
AK Sponsor
