Posted: 6/16/2025 8:59:39 PM EDT
|
Last winter I ordered a new lathe and love the heck out if it. This summer I'm buying a mill. And this one is available: Attached File I work with the guy. He upgraded to a CNC machine and offered me first crack at it. It's a Bridgeport with some power feeds. Comes with all R8 tooling and quick change. My question is though, due to my shop layout, I have to put this baby back up against a wall. That and I have one shot at free moving and placement, beyond that it's going to grow roots where it lands. How much room behind the unit do I need to leave? I've got plenty of side to side and overhead it's just that I have to keep it tight to the wall for shop space. Thoughts? |
Make your own Exploding Targets!
http://www.ar15.com/forums/topic.html?b=1&f=75&t=472752
Make your own Tac-Sling!
http://www.ar15.com/forums/topic.html?b=3&f=4&t=233665
http://www.ar15.com/forums/topic.html?b=1&f=75&t=472752
Make your own Tac-Sling!
http://www.ar15.com/forums/topic.html?b=3&f=4&t=233665
|
Originally Posted By mnd: I've got mine pretty snug in a corner of my shop. I can sneak in behind it but only just. Is there any maintenance to do behind the thing? This one has a vfd mounted to the back for the 1 to 3 phase conversion. I can move that as it's just wiring. Don't know about anything else tho |
Make your own Exploding Targets!
http://www.ar15.com/forums/topic.html?b=1&f=75&t=472752
Make your own Tac-Sling!
http://www.ar15.com/forums/topic.html?b=3&f=4&t=233665
http://www.ar15.com/forums/topic.html?b=1&f=75&t=472752
Make your own Tac-Sling!
http://www.ar15.com/forums/topic.html?b=3&f=4&t=233665
|
Originally Posted By ggllggll: Is there any maintenance to do behind the thing? This one has a vfd mounted to the back for the 1 to 3 phase conversion. I can move that as it's just wiring. Don't know about anything else tho Originally Posted By ggllggll: Originally Posted By mnd: I've got mine pretty snug in a corner of my shop. I can sneak in behind it but only just. Is there any maintenance to do behind the thing? This one has a vfd mounted to the back for the 1 to 3 phase conversion. I can move that as it's just wiring. Don't know about anything else tho I've got a Cincinnati Toolmaster, and the VFD that replaced the old switch-gear mounts in the base. I can squeeze myself back there but haven't needed to in 5+ years. If you need to hang stuff off the long ends of your table then you'll want a different position, but I'm not working with long shafting so it hasn't been a factor. |