Posted: 9/1/2005 4:32:52 PM EDT
Link Posted: 9/1/2005 4:34:27 PM EDT
There was a thread on it. 9ft of water in the commissary/BX. 900mil worth of damage just to Keesler. But the field is cleared of debris and open and taking flights.
Link Posted: 9/1/2005 4:35:35 PM EDT
Keesler didn't fare well and Biloxi...? Have you not been watching the news?

Biloxi is decimated. Pretty much the whole city will have to be rebuilt.
Link Posted: 9/1/2005 4:38:41 PM EDT
I saw the city of Long Beach was wiped out. Is the Friendship Oak still standing?
Link Posted: 9/1/2005 4:40:54 PM EDT
Huge damage at Keesler

* Base Commander is estimating $800M -$900M
* Every single structure is damaged
* Entire Housing areas under water
* Everyone accounted for - no deaths at Keesler
* Beau Rivage - water up to 3rd story
* Keesler is limping through with generators
* 80% of all trees - gone
* 9 Foot water in commissary/BX



The Commissary



Some Building

Link Posted: 9/1/2005 4:41:06 PM EDT
Link Posted: 9/1/2005 4:44:46 PM EDT
[Last Edit: 9/1/2005 4:45:45 PM EDT by eodtech2000]

Originally Posted By cmjohnson:
So I guess Allee Hall and the other school buildings are out of action for the time being?

What else...how are the student squadrons? First floor completely under water for a while?

It WAS a nice base. I guess it will be again.


And no, I managed to miss most of the news regarding it. No news at work, and when I get
home at the end of the day, I do everything BUT watch TV.

CJ



Here is an email we all got here at AFRC from Keesler.

Subject: Keesler - Hurricane Katrina Update


Keesler AFB

Tech Training Issues

Students have not been evacuated/Tech Training classrooms are now shelters

No inbound students or TDY personnel for at least 3 wks

Not anticipating starting classes back up until 3 Oct 05

On Base Damage Assessment

No Long Distance capability

Limited local and cell phone

DSN lines are operational

MS Power Co does not anticipate power back to base for 3 wks

All power running on generator

Hospital running on generator power (C-section done in the dark)

All permanent party housing unlivable, still trying to find out where everyone is displaced to

Runway anticipated to be operational by 1100 hours today

FEMA working to relocate some on base personnel to other bases

Communication to inbound ACFT via UHF Radio

Hanger damage where 2 AFRC C-130's are bed down (damage assessment to follow)

AEF Issues

Keesler asking for early return of 311 members in the AOR to be w/ their families