Warning

 

Close

Confirm Action

Are you sure you wish to do this?

Confirm Cancel
Member Login
Site Notices
10/20/2017 1:01:18 AM
9/22/2017 12:11:25 AM
Posted: 9/25/2005 4:38:30 PM EDT
I'm thinking about buying two Krink kits. One in 7.62 and the other one in 5.45. I would like to get them SBR'd as side folders. What is the process for applying for the $200 stamp that you need to have them SBR'd. And any recommendations on how to take a kit that is an underfold and switch it to side folder.
Link Posted: 9/25/2005 4:48:42 PM EDT
Link Posted: 9/25/2005 4:57:55 PM EDT
[Last Edit: 9/25/2005 6:00:16 PM EDT by slammer11111]
I don't have a receiver or anything right now. I'm just trying to get all of my facts together before I do anything. I would be buying the kits and then going from there. Krinkfreak recommended a side folder for the Krink. So, I'm gonna go with the advice of someone who knows. Us 2LT's know how to listen to the senior enlisteds.
Link Posted: 9/26/2005 8:01:51 AM EDT
How much of a pain is it to get the $200 tax stamp paperwork completed for an SBR?
Link Posted: 9/26/2005 8:20:20 AM EDT
Link Posted: 9/26/2005 12:05:37 PM EDT
You'd be amazed at how fast your $200 dollar check gets cashed versus how long it takes for you to get approval back.

Link Posted: 9/26/2005 2:41:17 PM EDT
Sounds like the govt. When you owe the govt money, in the military, you'll see it taken out of your next paycheck; no matter if that means you get $0 for your next paycheck. But when they owe you, all you can do is shut up and color. Is it a seperate form for each SBR? Where do you find the forms?
Link Posted: 9/26/2005 4:56:24 PM EDT
Never done it myself but from what I've heard the first (only?) obstacle is to make sure your local chief LEO will sign off on your form.

Other than that it's just money and wait.

Per the article in the latest SGN, the form says you should not call to check progress until 90 days, but per the ATF office in VA you should basically call EVERY day after 90 to push it through.

Good luck. I've already got my 7.62 SBR kit and I'm pondering one of those K-var krinks myself.
Link Posted: 9/26/2005 5:13:46 PM EDT
It's actually pretty easy you just need to go through the stupid bullshit. You'll get it all over with in an afternoon.
Link Posted: 9/26/2005 6:53:51 PM EDT

Originally Posted By krinkfreak:

Originally Posted By slammer11111:
How much of a pain is it to get the $200 tax stamp paperwork completed for an SBR?



Never done it, but it can't be too difficult......It's a guvment form...........





My LLC tax-stamp came back in 1 month and 5 days, and that was for a SBR.
Link Posted: 9/26/2005 8:00:06 PM EDT
Would it be best to buy the kit and send off for the stamp once I've got everything shipped off to the builder? Or should I get the stamp and then worry about shipping it off?
Link Posted: 9/26/2005 8:57:10 PM EDT
Is it true no SBR in WA?
Link Posted: 9/26/2005 9:41:14 PM EDT
Anyone know of any group buys for 7.62 or 5.45 krink kits?
Link Posted: 9/26/2005 10:07:30 PM EDT

Originally Posted By slammer11111:
Anyone know of any group buys for 7.62 or 5.45 krink kits?



many people would like to get in on a group buy but no luck, there are only a few left
here is a link to a person where I bought mine last week, link here
they are the cheapest and also the newest you will ever get, they are 2005's and also have tritium night sights.
Link Posted: 9/27/2005 6:52:12 AM EDT
Is there THAT big a difference between the ones offered there and the ones that ORF is offering?
Link Posted: 9/27/2005 8:12:30 AM EDT

Originally Posted By slammer11111:
Is there THAT big a difference between the ones offered there and the ones that ORF is offering?



it's the same kit. I didn't check the year manufacture on mine from ORF but it's got the tritium sights and is excellent.
Link Posted: 9/27/2005 2:06:44 PM EDT
[Last Edit: 9/27/2005 2:08:03 PM EDT by exilefromhell]
buy a receiver $50-100, do the paperwork$200, send it off to NFA, get a kit $400-600, send to inrangec2 or other smith while being processed (2 month back log 1 month ago) or after the paperwork comes back (3-4 months// or 6-7 month total wait) with ~$450 for the build. IM questions.. I'm on the last step (build/waiting).
Top Top