We're running 30% off sales for Black Friday right now. 30% OFF SITE WIDE CODE: "BLACK30"
Order fulfillment is today bolstered by our inside sales staff who are totally buried in orders received on this sale week.
At Griffin we're thankful for a new Puma 2100 SY II, delivered Monday (our second new 2100 SY II purchase for this fall, and our 6th machine purchase for this year). We were complete through temp power, HVAC/mistaway plumbing, compressed air, auto door, high pressure coolant mechanical integration on Wednesday, and the manufacturing guys are off today probably hunting. On Monday we'll be onto robot mechanical integration, bracket removal, floor leveling, floor settup, and electrical systems integration of the robot, auto-door, bar loader, chipblaster high pressure coolant system, settup of the control collision interference zones, configuration of Manual Guide i / easy guide Fanuc/Doosan run screens, finally loading tools and getting this machine back into production hopefully mid-week.
This machine replaces one of our turning machines- a 2017 installed Fanuc based machine from another brand that was running production jobs when we pulled it to replace it with this 2019 model machine.
Reliability of equipment, and fast, competent, fiscally responsible field service and parts support plays a factor in delivering at the speed of business. We take that pretty seriously here and are constantly working to keep our total production chain reliable to meet customer quality, supply and availability, and delivery expectations.
Failed To Load Title